85-inch screens on the wall for Master Mix in Frogmore
85-inch screens wall-mounted and a new network switch for Master Mix.
Every SEG job is recorded before, during and after. These case studies show how that plays out across housing, heritage, commercial and domestic work — and what the client got at the end.

Real jobs, with the details and photos from our engineers’ job sheets.

85-inch screens wall-mounted and a new network switch for Master Mix.

Lighting, power, data, fire alarm and door entry for serviced apartments at 37 Doughty Street.

Cisco Wi-Fi, Verkada access control and AV for James Hambro's new Edinburgh office.

LD1 Aico smoke alarms for a sheltered housing scheme in Walthamstow.

Garden uplights and floodlights traced and fixed over two visits.

LED battens, PIR sensors and nine new sockets for a charity’s centre.

Storage heater replaced, with a 20A isolator and an on-peak supply.

Melted outdoor hot tub socket replaced with a weatherproof one.

EV charger connection fixed with a certified network cable.

Corroded LED strip feed re-run and garden lights fixed in a day.

Old services cleared for the plumbers, then a tripping circuit traced.

Four LED floodlights fitted, re-angled and their sensors set correctly.

EICR, remedials, call-outs and new CCTV for Fonthill Care Home.

EICR that found a burning immersion connection, fixed on the spot.

Paxton to Verkada access control changeover on 11 office doors.

Failed loft extractor fan replaced on a same-day call-out.

Zappi charger, new EV board with surge protection and upgraded bonding.

32-panel ground-mounted SolarEdge array back in production after a power cut.

Three boards replaced and every EICR defect put right.

Old Wylex board swapped for all-RCBO protection, faults traced and fixed.

Failed pedestal charger replaced and proved on a live charge.

Audit and EICR of another installer’s extension work, urgent faults fixed.

Andersen A2 charger, new EV board and a discreet SWA run.

PV circuit re-protected with its own 100mA RCD to stop nuisance tripping.

New lighting circuit, emergency lighting key switch and metal conduit.

USB-C sockets, downlights, a new fan and a safer bedroom circuit.

myenergi Zappi on a new 32A RCBO, tested and proved on the car.

Faults fixed during testing and the EICR issued Satisfactory.

Solar arrays removed, stored and refitted with bird mesh around new roofs.

Path and spike lights replaced and junctions remade on a Rako system.

Aico fire and CO alarms, a data cabinet and Wi-Fi for St Bartholomew’s RC Church.

Dual Zappi charging post with load management at a business depot.

We took over the back office for a care home's two chargers, caught a dead unit within days, made it safe and tested the other on our van.

A new OM4 fibre link joining a business's existing building to the one next door, installed and fire-sealed in a day.

The boiler was fine but the heating would not start reliably. Supply and wiring cleared, fault narrowed to the controls.

Every flat in a 105-apartment London block inspected, remedials done and 105 satisfactory EICRs issued in 11 days on site.

Failing outdoor lights across a school site traced and upgraded to LED: wall lights, lamp posts and emergency bulkheads.

Pools and spas, lighting control, cinema rooms and garden lighting, led by our director Michael Simm.

Appello digital warden call upgrades across L&Q sheltered housing, delivered with United Living in occupied homes.

Electric radiant heating for a historic church in St Albans, with remote control for the stakeholders.
Send us the brief or the fire risk assessment. We’ll come back with a plan and a price.
Questions about a job, a certificate or a programme of works? Call the office or send a message. Head office in St Albans, serving Herts, Beds, Bucks and London.