An old Wylex board replaced in Radlett, and the faults it was hiding.

Several circuits had no RCD protection. A new all-RCBO board with surge protection fixed that, and testing it uncovered faults we then traced and put right.

New FuseBox consumer unit fitted and labelled in the garage

The homeowner's old Wylex split-load board left many circuits without RCD protection. SEG replaced it with a modern all-RCBO consumer unit with surge protection, then traced and fixed faults the new board's testing revealed.

At a glance
LocationRadlett (WD7)
CompletedNovember 2025
WorkConsumer unit replacement
PropertyFamily home
Time on siteTwo days (26-27 Nov 2025)
SEG teamChris
New FuseBox consumer unit fitted and labelled in the garage
New FuseBox consumer unit fitted and labelled in the garage
Inside the new board: RCBOs, surge protection and 100A main switch
Inside the new board: RCBOs, surge protection and 100A main switch
Before: old Wylex split-load board with partial RCD protection
Before: old Wylex split-load board with partial RCD protection
New consumer unit with its cover closed and warning labels
New consumer unit with its cover closed and warning labels
Insulation resistance test on the new board
Insulation resistance test on the new board

What we found

  • Old Wylex board with a single 30mA RCCB and several circuits not RCD protected; mixed old and new wiring colours
  • High R1+R2 readings on kitchen and hallway sockets - multiple spurred sockets and a suspected underfloor junction box
  • Some cables connected to breakers but left off
  • 69.4V measured between line and earth on upstairs lighting cables
  • Damaged socket at the top of the stairs

What we did

  • Replaced the board with a FuseBox consumer unit: 100A main switch, Type 2 SPD and individual 30mA RCBOs (B6, B16, B32)
  • Labelled the new board and circuits
  • Investigated and rectified the high R2 on the kitchen ring by checking terminations
  • Investigated bedroom and lounge socket circuits
  • Replaced the damaged socket in the hallway
  • Traced the upstairs lighting fault, separating a shared feed in a loft junction box
  • Reconnected fittings and retested

Equipment used

  • FuseBox consumer unit (all-RCBO)
  • FuseBox SPD1MT2 surge protection device
  • FuseBox 30mA RCBOs
Need something similar in Radlett? See consumer unit replacement, or electricians in Radlett. Call 0345 3 822 833 or tell us about the job.

More recent local jobs

From SEG’s job records and engineers’ photos. Customer details are kept private.

Need it done by a date?

Tell us the deadline. We’ll tell you honestly whether we can hit it — and we usually can.

Contact

Talk to SEG

Questions about a job, a certificate or a programme of works? Call the office or send a message. Head office in St Albans, serving Herts, Beds, Bucks and London.

Emailhello@segplc.comPhone0345 3 822 833St Albans local line01727 238 999OfficeSEG House, 192 Watford Road, Chiswell Green, St Albans, Herts AL2 3EBHours7 days, 7am–10pm · emergencies by arrangementLeadershipMichael Simm · Russell Solts
Call nowGet a quote