An old Wylex board replaced in Radlett, and the faults it was hiding.
Several circuits had no RCD protection. A new all-RCBO board with surge protection fixed that, and testing it uncovered faults we then traced and put right.

The homeowner's old Wylex split-load board left many circuits without RCD protection. SEG replaced it with a modern all-RCBO consumer unit with surge protection, then traced and fixed faults the new board's testing revealed.
At a glance
| Location | Radlett (WD7) |
|---|---|
| Completed | November 2025 |
| Work | Consumer unit replacement |
| Property | Family home |
| Time on site | Two days (26-27 Nov 2025) |
| SEG team | Chris |





What we found
- Old Wylex board with a single 30mA RCCB and several circuits not RCD protected; mixed old and new wiring colours
- High R1+R2 readings on kitchen and hallway sockets - multiple spurred sockets and a suspected underfloor junction box
- Some cables connected to breakers but left off
- 69.4V measured between line and earth on upstairs lighting cables
- Damaged socket at the top of the stairs
What we did
- Replaced the board with a FuseBox consumer unit: 100A main switch, Type 2 SPD and individual 30mA RCBOs (B6, B16, B32)
- Labelled the new board and circuits
- Investigated and rectified the high R2 on the kitchen ring by checking terminations
- Investigated bedroom and lounge socket circuits
- Replaced the damaged socket in the hallway
- Traced the upstairs lighting fault, separating a shared feed in a loft junction box
- Reconnected fittings and retested
Equipment used
- FuseBox consumer unit (all-RCBO)
- FuseBox SPD1MT2 surge protection device
- FuseBox 30mA RCBOs
Need something similar in Radlett? See fuse board replacement, or electricians in Radlett. Call 01727 238 999 or tell us about the job.
More recent local jobs
- 85-inch screens wall-mounted and a new network switch for Master Mix, Frogmore, November 2026
- Lighting, power, data, fire alarm and door entry for serviced apartments at 37 Doughty Street, Bloomsbury, London, 2022
- Cisco Wi-Fi, Verkada access control and AV for James Hambro's new Edinburgh office, Edinburgh, October 2026 (in progress)
- LD1 Aico smoke alarms for a sheltered housing scheme in Walthamstow, Walthamstow, October 2026 (in progress)
From SEG’s job records and engineers’ photos. Customer details are kept private.
Need it done by a date?
Tell us the deadline. We’ll tell you honestly whether we can hit it — and we usually can.