A solar PV system that kept tripping the RCD in London Colney.
The inverter was off and the house RCD kept tripping. Testing pinned it down, and the inverter maker confirmed the fix: its own 100mA RCD.

A tenant's solar PV system kept tripping the house RCD and the inverter was off. SEG investigated and re-arranged the PV circuit protection to the inverter maker's requirements.
At a glance
| Location | London Colney (AL2) |
|---|---|
| Completed | March 2026 |
| Work | Solar PV fault-finding |
| Property | Semi-detached house |
| Time on site | Two visits (26 Feb and 6 Mar 2026) |
| SEG team | Tom and Matthew |





What we found
- Inverter off and the PV MCB off on arrival
- AC side insulation resistance clear up to the inverter isolator; DC strings (front and rear roof, in series) tested clear to earth
- Insulation resistance dropped significantly when the inverter AC isolator was on, and cleared with the PV neutral disconnected
- Inverter manufacturer advised against 30mA RCD protection (the inverter has its own RCD) and recommended a dedicated 100mA RCD
- Damaged bird mesh on the array
What we did
- Fault-found on the Solis inverter, AC/DC isolators and strings in the loft
- Tightened terminals in the DC isolator and checked all AC isolator connections
- Spoke to the inverter manufacturer's technical team to confirm the correct protection
- Moved the PV MCB to before the RCDs in the Hager board
- Fitted a secondary enclosure with a 2-pole 100mA Type A bi-directional, non-time-delayed RCD and 20A Hager MCB for the PV
- Tested Ze, PFC and R1+R2 for the PV circuit at the inverter isolator
- Relabelled the main board and labelled the new enclosure; all left working
Equipment used
- Solis S5 series inverter
- Hager consumer unit (existing)
- 100mA Type A 2-pole bi-directional RCD
- Hager 20A MCB
Need something similar in London Colney? See solar PV, or electricians in London Colney. Call 01727 238 999 or tell us about the job.
More recent local jobs
- 85-inch screens wall-mounted and a new network switch for Master Mix, Frogmore, November 2026
- Lighting, power, data, fire alarm and door entry for serviced apartments at 37 Doughty Street, Bloomsbury, London, 2022
- Cisco Wi-Fi, Verkada access control and AV for James Hambro's new Edinburgh office, Edinburgh, October 2026 (in progress)
- LD1 Aico smoke alarms for a sheltered housing scheme in Walthamstow, Walthamstow, October 2026 (in progress)
From SEG’s job records and engineers’ photos. Customer details are kept private.