Reviving Warmth: Radiant Heating Upgrade at St. Bartholomew Church

A project led by our director, Michael Simm, that brought warmth and modern energy-saving technology to St Bartholomew’s Church in St Albans. Facing a frigid winter last year due to an underperforming electric underfloor heating system, the church turned to radiant heaters from BN Thermic. Let’s delve into this transformative upgrade and explore the concept of radiant heating.

Radiant heating upgrade at St Bartholomew Church, St Albans

The Radiant Revolution: Exploring Radiant Heating

Radiant heating is an innovative approach to heating spaces, prioritizing energy efficiency and comfort. Instead of heating the air, radiant heaters emit infrared radiation, which directly warms surfaces and objects within a room. This method holds several key advantages:

  • Efficiency – Radiant heating excels in energy efficiency as it reduces heat loss through air circulation. For a spacious and grand setting like St. Bartholomew Church, this translates to substantial energy savings.
  • Uniform Comfort – Worshippers and visitors now experience consistent and enveloping warmth, akin to the gentle caress of sunlight on a crisp winter’s day.
  • Precision Control – The installation includes six time-controlled switching times, showcasing the adaptability of radiant heating. It can be finely tuned to match the church’s specific heating needs, maximising energy conservation.

The Transformation Process

During this revitalisation project, several critical steps were taken to ensure the church’s comfort and efficiency:

  • Fuseboard Upgrades and Contactor Installation – To manage the switching load effectively, the project involved upgrading fuse-boards and installing contactors. This enhanced control over the heating system’s operation.
  • Seamless Integration – The team’s craftsmanship shone as they installed high-level galvanised steel trunking, meticulously crafting the metalwork to seamlessly blend with the church’s architectural beauty. This attention to detail not only ensured functionality but also preserved the church’s aesthetic appeal.

Remote Control for Convenience

The final phase of this transformation involved setting up key stakeholders with Heatmiser, a cutting-edge control system. This advancement allows authorised individuals to manage the church’s heating remotely, ensuring a warm and inviting environment even when no one is physically present.

In conclusion, the radiant heating upgrade at St. Bartholomew Church stands as a testament to the fusion of tradition and innovation. Working with BN Thermic, the team has not only restored warmth but also ushered in energy efficiency and modern control. This project not only renews the church’s physical comfort but also adds a touch of technological sophistication to its timeless charm.

What was fitted, and why

The church’s 62-year-old electric underfloor heating had failed, and the congregation had sat through a cold winter. The new scheme had two jobs:

  • Heat people during services. Shortwave infrared heaters warm people and surfaces directly rather than the air, so they work in a tall space within minutes of switching on. For a building used a few times a week, that is the most cost-effective way to heat it.
  • Protect the building when it is empty. Two fan heaters hold a low background temperature to keep damp and mould off the fabric of the church. They are not there to heat the congregation.
HeaterWhereWhat it does
9 × BN Thermic HN3-60M shortwave infrared, 6kWNave walls, about 4.5m upWarms the congregation during services
2 × BN Thermic HN2-45BM shortwave infrared, black, 4.5kWSanctuary, about 4.5m upWarms the altar area
BN Thermic CH2-15 ceramic heater, 1.5kWLady Chapel, about 3m upQuick, focused heat in a small space
2 × BN Thermic OUH2-10 fan heaters, 10kWAbout 3.5m upLow background heat when the church is empty, against damp and mould

Supply and controls. The fuse boards were upgraded and contactors fitted to switch the heater load. Cables run in high-level galvanised steel trunking, finished to suit the building. Heatmiser neoStat thermostats with a neoHub give timed heating, frost protection and control from a phone, so the church can have the building warm for a service without anyone going in to switch it on.

The installation, in photos

The nave of St Bartholomew's Church, St Albans, looking towards the sanctuary
The nave, looking towards the sanctuary
Nave looking back towards the gallery, with infrared heaters high on both walls
Looking back to the gallery, heaters high on both walls
Row of BN Thermic infrared heaters fixed high along the nave wall between the windows
A row of HN3 heaters along the nave wall
Infrared heaters along the nave wall, two of them switched on
Heaters on, high above the pews
Infrared heater angled down from the nave wall, glowing red
Each heater angled down to the seating
Infrared heater on above the windows, fed from galvanised trunking along the wall
Fed from galvanised trunking along the wall
Infrared heater with its isolator and the high-level galvanised trunking
Isolator and trunking beside each heater
Church gallery with infrared heaters fitted to the gallery front and walls
The gallery, heated too
Infrared heater fixed to the front of the church gallery, switched on
A heater on the gallery front
Black BN Thermic infrared heater on the red sanctuary wall, switched on
Black heaters in the sanctuary
Black infrared heater angled down from the red sanctuary wall above a window
Angled down to the altar
BN Thermic ceramic heater fixed high on the wall in the Lady Chapel
The ceramic heater in the Lady Chapel

Back to check it under full load

In December 2024 our engineer went back to the church, switched every heater on at once and took current readings on each of the three phases and the neutral, to see the full demand on the installation.

Back again in 2026: fire and carbon monoxide alarms

In July 2026 the church asked us back to protect its community hall and ancillary rooms. We fitted an Aico RadioLINK+ wireless system of smoke, heat and carbon monoxide alarms, with a controller and a gateway that sends an alert to nominated phones through the Aico HomeLINK app whenever an alarm goes off.

The community hall is about 16m by 9m with a 5m ceiling and is heated by three gas-fired warm air heaters, so each heater has its own carbon monoxide alarm nearby, and the hall has three smoke alarms rather than two, to cover the whole space and allow for staging and furniture. See Aico fire and CO alarms.

“The job was very complex but the team rose to the challenge and we now have a heating system that is perfect for our needs for the next 60 years plus. Also a very friendly and helpful team.”

St Bartholomew’s Church, St Albans

Heating a church, hall or other large space in Hertfordshire? See industrial and commercial electric heating or call 01727 238 999.

Need it done by a date?

Tell us the deadline. We’ll tell you honestly whether we can hit it — and we usually can.

Contact

Talk to SEG

Questions about a job, a certificate or a programme of works? Call the office or send a message. Head office in St Albans, serving Herts, Beds, Bucks and London.

Emailhello@segplc.comPhone01727 238 999Also on0345 3 822 833OfficeSEG House, 192 Watford Road, Chiswell Green, St Albans, Herts AL2 3EBHours7 days, 7am–10pm · emergencies by arrangementLeadershipMichael Simm · Russell Solts
Call nowGet a quote