Three days of EICR remedial work in Hertford.

An older town-centre property, a list of defects from its EICR, and three boards to replace. Everything put right, tested and labelled.

New Wylex board with surge protection, labelled after remedial works

An EICR on an older town-centre property listed a range of defects. The owner instructed SEG to carry out the remedial works, including the boards serving the house, utility room and garden outbuilding.

At a glance
LocationHertford (SG14)
CompletedJune 2026
WorkEICR remedial works
PropertyOlder town-centre property with garden outbuilding
Time on siteThree days (28-29 May and 1 Jun 2026)
SEG teamTom, Henry, George and Arthur
New Wylex board with surge protection, labelled after remedial works
New Wylex board with surge protection, labelled after remedial works
New external lantern on the garden outbuilding
New external lantern on the garden outbuilding
Main board during replacement, showing new RCBOs and terminations
Main board during replacement, showing new RCBOs and terminations
Outbuilding board with RCBOs and isolator, fully terminated
Outbuilding board with RCBOs and isolator, fully terminated
External lantern fitted beside the outbuilding door
External lantern fitted beside the outbuilding door
RCD and loop testing on the new board
RCD and loop testing on the new board

What we found

  • Downlights joined with connector blocks, with exposed conductor whiskers
  • Socket back box not secured (missing lug) and a broken socket
  • Twin and earth clipped externally with no mechanical or UV protection
  • Poor end-to-end readings on a ring final circuit caused by loose terminations
  • Damaged PIR on the rear external light

What we did

  • Replaced the main distribution board, building a spacer to bridge two wall depths, and relocated the main earthing terminal
  • Installed a 2-pole isolation switch and used the old enclosure as an isolated joint box
  • Replaced the utility-room and outbuilding boards (Wylex), fitting banjos and crimped fly leads to the SWA glands for sound earths
  • Re-terminated every downlight with Wago connectors in safe enclosures and replaced bathroom downlights with IP-rated units
  • Replaced damaged sockets and repositioned an external socket to keep water out
  • Fitted new shed lights and external lanterns
  • Ran new conduit discreetly behind the guttering to protect the external cable
  • Split the ring, found and tightened loose terminations, and retested to good readings
  • Torqued all terminals, tested RCDs, polarity and earth fault loop at all points, and labelled all boards

Equipment used

  • Wylex consumer units / distribution boards
  • Wylex RCBOs
  • Wago connectors
  • IP-rated downlights
  • External lanterns

More recent local jobs

From SEG’s job records and engineers’ photos. Customer details are kept private.

Need it done by a date?

Tell us the deadline. We’ll tell you honestly whether we can hit it — and we usually can.

Contact

Talk to SEG

Questions about a job, a certificate or a programme of works? Call the office or send a message. Head office in St Albans, serving Herts, Beds, Bucks and London.

Emailhello@segplc.comPhone0345 3 822 833St Albans local line01727 238 999OfficeSEG House, 192 Watford Road, Chiswell Green, St Albans, Herts AL2 3EBHours7 days, 7am–10pm · emergencies by arrangementLeadershipMichael Simm · Russell Solts