Three days of EICR remedial work in Hertford.
An older town-centre property, a list of defects from its EICR, and three boards to replace. Everything put right, tested and labelled.

An EICR on an older town-centre property listed a range of defects. The owner instructed SEG to carry out the remedial works, including the boards serving the house, utility room and garden outbuilding.
At a glance
| Location | Hertford (SG14) |
|---|---|
| Completed | June 2026 |
| Work | EICR remedial works |
| Property | Older town-centre property with garden outbuilding |
| Time on site | Three days (28-29 May and 1 Jun 2026) |
| SEG team | Tom, Henry, George and Arthur |






What we found
- Downlights joined with connector blocks, with exposed conductor whiskers
- Socket back box not secured (missing lug) and a broken socket
- Twin and earth clipped externally with no mechanical or UV protection
- Poor end-to-end readings on a ring final circuit caused by loose terminations
- Damaged PIR on the rear external light
What we did
- Replaced the main distribution board, building a spacer to bridge two wall depths, and relocated the main earthing terminal
- Installed a 2-pole isolation switch and used the old enclosure as an isolated joint box
- Replaced the utility-room and outbuilding boards (Wylex), fitting banjos and crimped fly leads to the SWA glands for sound earths
- Re-terminated every downlight with Wago connectors in safe enclosures and replaced bathroom downlights with IP-rated units
- Replaced damaged sockets and repositioned an external socket to keep water out
- Fitted new shed lights and external lanterns
- Ran new conduit discreetly behind the guttering to protect the external cable
- Split the ring, found and tightened loose terminations, and retested to good readings
- Torqued all terminals, tested RCDs, polarity and earth fault loop at all points, and labelled all boards
Equipment used
- Wylex consumer units / distribution boards
- Wylex RCBOs
- Wago connectors
- IP-rated downlights
- External lanterns
Need something similar in Hertford? See EICR testing and consumer unit replacement, or our work across Hertfordshire. Call 0345 3 822 833 or tell us about the job.
More recent local jobs
- Failed loft extractor fan replaced on a same-day call-out, St Albans, October 2026
- Zappi charger, new EV board with surge protection and upgraded bonding, St Albans, January 2026
- 32-panel ground-mounted SolarEdge array back in production after a power cut, Bricket Wood, April 2026
- Old Wylex board swapped for all-RCBO protection, faults traced and fixed, Radlett, November 2025
From SEG’s job records and engineers’ photos. Customer details are kept private.