Wi-Fi, access control and AV for James Hambro's Edinburgh office.

A separate contract from their London office: after surveying the building in June, we're fitting Cisco Wi-Fi, Verkada access control and AV at James Hambro's new offices on Charlotte Square, a listed Georgian townhouse in Edinburgh.

SEG van on Charlotte Square, Edinburgh, outside James Hambro's new office

James Hambro & Partners are moving into offices on Charlotte Square in Edinburgh, a Category A listed Georgian townhouse in the city's World Heritage Site. This is a separate contract from their St James's office in London. We surveyed the building for Wi-Fi in June 2026, and in October we started fitting Cisco Wi-Fi, Verkada access control and the AV, working around the building's fabric.

At a glance
LocationCharlotte Square, Edinburgh (EH2)
CompletedOctober 2026 (in progress)
WorkWi-Fi, access control and AV for a new office
PropertyWealth management office in a Category A listed Georgian townhouse
Time on siteWi-Fi survey in June 2026; installation started October 2026
SEG teamOlly and Charlie

The building

SEG van on Charlotte Square, outside James Hambro's Edinburgh office
SEG van on Charlotte Square, outside James Hambro's Edinburgh office
Charlotte Square, Edinburgh, from the office steps
Charlotte Square, Edinburgh, from the office steps
The entrance hall: a listed Georgian interior, so every route is planned around it
The entrance hall: a listed Georgian interior, so every route is planned around it

First fix: fibre and data cabling

The lower ground comms room, where the new fibre route starts
The lower ground comms room, where the new fibre route starts
New Cat6 data cabling run in cable basket
New Cat6 data cabling run in cable basket
Data cables under the floorboards between rooms
Data cables under the floorboards between rooms
Cat6 data cables pulled down from the ceiling void on an upper landing, with the carpet sheeted
Cat6 data cables pulled down from the ceiling void on an upper landing, with the carpet sheeted

Stripping out the old door entry and access control

The entrance hall with the old door entry panel off the wall and the door release opened up
The entrance hall with the old door entry panel off the wall and the door release opened up
The old video door entry panel, taken out ready for the new system
The old video door entry panel, taken out ready for the new system
Behind the old entry panel: the cables come through solid masonry
Behind the old entry panel: the cables come through solid masonry
The old door lock hardware coming off the frame
The old door lock hardware coming off the frame
The old electric strike in the door frame, before the changeover
The old electric strike in the door frame, before the changeover
One of the old access control controllers, dated November 2012, before it is replaced
One of the old access control controllers, dated November 2012, before it is replaced

Second fix: the new Verkada door controller

Door cables brought down through the wall void, dressed with a tidy service loop and fixed with saddles before they enter the enclosure
Door cables brought down through the wall void, dressed with a tidy service loop and fixed with saddles before they enter the enclosure
The new Verkada AC43 four-door controller mounted level in its enclosure, earthed, with brass bushes on the conduit entries
The new Verkada AC43 four-door controller mounted level in its enclosure, earthed, with brass bushes on the conduit entries
Door cables entering the controller through steel conduit, ready to terminate
Door cables entering the controller through steel conduit, ready to terminate

What we found

  • A Category A listed building in the World Heritage Site, so every fixing and cable route has to respect the original fabric
  • Thick stone walls and solid floors between levels, so access point positions had to come from an on-site survey rather than a floor plan
  • Risers running up from the lower ground comms room, which give a clean route for the new fibre without opening up the period rooms

What we did

  • June 2026: Wi-Fi design survey of every floor, lower ground to third, with access point positions, data outlets and floor boxes marked on the plans and a heat-map report
  • October 2026: fitting Cisco Wi-Fi access points at the confirmed positions
  • Changing the door access over to Verkada, the same system we are fitting at their St James's office in London
  • Mounting the new Verkada AC43 controller in its enclosure, with the door cables run through steel conduit and brass bushes and a service loop left in the void for future changes
  • Fitting the display screens at the agreed TV positions
  • Pulling new Cat6 data cabling through the ceiling voids to each access point and outlet position
  • Planning the fibre route from the lower ground comms room up through the risers to the data cabinet upstairs
  • Power and data for CCTV and the bar area, to follow once the positions are confirmed

Equipment used

  • Cisco Wi-Fi access points
  • Verkada access control (AC43 door controller)
  • Display screens
  • Fibre and Cat6 data cabling
Need something similar in Edinburgh? See business Wi-Fi and access control, or our commercial work. Call 01727 238 999 or tell us about the job.

More recent local jobs

From SEG’s job records and engineers’ photos. Customer details are kept private.

Need it done by a date?

Tell us the deadline. We’ll tell you honestly whether we can hit it — and we usually can.

Contact

Talk to SEG

Questions about a job, a certificate or a programme of works? Call the office or send a message. Head office in St Albans, serving Herts, Beds, Bucks and London.

Emailhello@segplc.comPhone01727 238 999Also on0345 3 822 833OfficeSEG House, 192 Watford Road, Chiswell Green, St Albans, Herts AL2 3EBHours7 days, 7am–10pm · emergencies by arrangementLeadershipMichael Simm · Russell Solts
Call nowGet a quote