Open · 7 days, 7am–10pmHead office St Albans · Herts · Beds · Bucks · London
  1. Home
  2. Sports lighting

Sports pitch and club floodlighting.

LED floodlights for football, rugby, tennis and padel clubs, designed with BELL Lighting and wired and certified by SEG.

LED floodlights fitted by SEG on a column
Where the numbers come from. BELL Lighting is a UK lighting manufacturer. What this page says about BELL products and BELL projects is taken from BELL’s own published material, checked in November 2026, and linked so you can read it. The BELL projects are BELL’s, not ours. Standards and funding come from the governing bodies, linked in the text. Funding rules change often, so check before you rely on one.

Clubs are replacing metal halide floodlights with LED to cut running costs, get a more even light and control spill into nearby homes. SEG does the electrical side, and we work with BELL Lighting, a UK manufacturer founded in 1920 and based in West Yorkshire, whose design team draws up the lighting scheme.

Floodlighting by sport

SportTypical light level to aim forOur page
Football250 lux (Step 1), 200 lux (Step 2), 120 lux for training (FA)Football pitch lighting
RugbyDepends on league; BELL quotes 100 to 500 lux (RFU levels)Rugby pitch lighting
Tennis500 lux inside the lines recommended, 400 lux minimum (LTA)Tennis court lighting
Padel300 lux recreational, 500 lux competition (LTA and SAPCA)Padel court lighting

Why LED

The FA Guide to Floodlighting puts the energy and maintenance saving from LED at 25 to 40 per cent against metal halide, with far less loss of output over time. LED switches on instantly and can be zoned and dimmed, and a good design cuts glare and light spill, which is what councils look at. BELL’s sports range includes the Powertron pitch floodlight, the Virtus for tennis and smaller areas and the Skyline Padel for padel courts. See BELL’s sports lighting range.

How an upgrade runs

  1. Design first. You tell us the sport, the level of play, the pitch size and the existing columns. BELL’s lighting design service, which BELL describes as complimentary, turns that into a report with a luminaire schedule and spill and glare calculations, in 3 to 5 working days for a standard project and 5 to 7 for a larger one (BELL’s figures). See BELL’s lighting design service.
  2. Survey. We look at the supply, the cable routes, the feeder pillar or switchgear, and the columns. Old columns need a structural check before new heads go on.
  3. Quote. We price the electrical works. Who does column and groundworks is agreed at survey, so you get one clear scope.
  4. Planning, if needed. The design report is what the council asks to see.
  5. Install, test and certify. Fixing, cabling, controls, electrical test certificates, then an illuminance check against the design.

What we do on the electrical side

  • Supply and capacity. We check the incoming supply early. A new or upgraded supply can add a lot to the cost, so you want to know before you commit.
  • Cabling and distribution. Armoured cable in ducts or trenches, a feeder pillar or distribution board near the pitch, and earthing for every column. The FA’s guide asks for trenches at least 450 mm deep and earth rods on all columns.
  • Protection and controls. Circuit protection sized for the load, plus the switching you want: zones, timers, dimming, or app control.
  • Testing and paperwork. Every circuit is tested and certified to BS 7671, and you get the certificates for your insurer, your council and your league.
  • Safe working. Work at height and construction health and safety planning under CDM 2015 are part of the quote, not an afterthought.
Thinking about LED floodlights for your club?

Tell us the sport, the level of play and how the ground is lit now, and we will come back with what is involved.

Email the office

Sports lighting questions

Who designs the lighting?

BELL Lighting’s design team draws up the scheme, with a luminaire schedule and spill and glare calculations. BELL describes the service as complimentary. We then price and carry out the electrical works.

Do we need planning permission to change our floodlights to LED?

Often yes. Floodlights are normally covered by planning conditions on hours, light levels and light spill, so a change usually needs the council. Some swaps that stay within the existing permission can be handled as a non-material amendment, but ask your council first. Do not order anything until you know.

Can we keep our existing columns?

Often, if they pass a structural check. LED heads are heavier than the metal halide heads they replace, so the columns and fixings need a structural report, and older columns may need a strength test. BELL’s published projects include several that reused existing columns.

How much does LED floodlighting cost?

It depends on the number of fittings, the columns, the cable runs and the supply, so we quote each ground. BELL’s design gives the schedule of fittings; we price the electrical works around it. We do not publish a figure because grounds vary so much.

Written by SEG. Last updated 5 November 2026.

Need it done by a date?

Tell us the deadline. We’ll tell you honestly whether we can hit it — and we usually can.

Contact

Talk to SEG

Questions about a job, a certificate or a programme of works? Call the office or send a message. Head office in St Albans, serving Herts, Beds, Bucks and London.

Emailhello@segplc.comPhone01727 238 999Also on0345 3 822 833OfficeSEG House, 192 Watford Road, Chiswell Green, St Albans, Herts AL2 3EBHours7 days, 7am–10pm · call-outs every dayLeadershipMichael Simm · Russell Solts
Call nowGet a quote